

|
WHO DID IT?
Global leader in the building solutions industry
- Upgrade from 3.11 to ECC 6.0 with all transactions, reports, and interfaces fully tested and adjusted
- Fujitsu provided a Project Manager up to 21 other resources covering all functional, technical and training aspects of the project
- Included an SEM BCS implementation for conversion of their LC
- 2 full production landscapes (Australia, US) upgraded at once
- This upgrade went into production on schedule and in time to begin converting other plants to this target release
A leading manufacturing of golf equipment and apparel
- The business purpose was to upgrade the SAP environment from version 4.5b to ECC 6.0 due to loss of existing support for the 4.5b environment.
- In addition ECC 6.0 brings additional functionality.
- The SAP supported platform for reliability was a big factor.
A leading provider of AEC software to the engineering news
– Record top 500 design firms
- Upgrading SAP system consisting of HCM, PM, SD, MM, FICO for all locations worldwide ensuring no impact to add on software such as CRM and other third party software
- Complete upgrade of SAP 4.7 to ECC 6.0 using only mostly offshore resources and 2 onsite resources.
- Offshore resources are leading functional, basis and ABAP areas. Basis, SD, FICO resources visited onsite locations in USA and Netherlands for business blueprint and integration testing phases of the project
|
|